IPFX TERMINAL 9.7.4-P // PUBLIC-GUESTMARKET STATUS OPEN / ONE-FLAP DELAYROOST NETWORK NOMINAL
P↗

Interborough Pigeon Futures Exchange

Opening operations, clearing queues, borough route activity, and the current Fountain 6 incident from the central exchange desk.

DESK-01
AUTHORIZED VIEW
ROCK-DOVE SEP +2.14 // CRUMB COMPOSITE -0.07 // LEDGE CAPACITY 72.6% // FERAL BLUE NOV +8 WINGS // HAWK CIRCUIT BREAKER ARMED
DESK-01 // PUBLIC CIRCULAR

Market Desk

Opening operations, clearing queues, borough route activity, and the current Fountain 6 incident from the central exchange desk.

COMPOSITE FLOCK14,802
OPEN COO-TEREST88.1K
CRUMB / BIRD3.44G
LEDGE UTIL.72.6%
WING VOLUME4.8M
HAWK RISKELEV.

OPENING OPERATIONS BOARD

Grand Rotunda

OPEN 14:00 UTC

Thirty-two floor specialists matching crumb and ledge contracts. Bell completed on first strike.

Pneumatic Clearing

TUBE 7 SLOW

Capsules are settling at 8.2 bar. Average custody handoff: 1.4 flaps.

Airspace Desk

ROUTES CLEAR

North clocktower crossing reopened after the umbrella silhouette was resolved.

INCIDENT 881-C: Fountain 6 remains covered by blue municipal tarpaulin. Splash-right contracts are halted; physical crumb delivery is unaffected.

WING CLEARING // DELIVERY QUEUE

WINDOWVENUEDELIVERABLEQUEUESTATUS
15:10CANAL BENCH 344g sesame crust18 capsulesCLEARED
15:45WESTERN CLOCK18 ledge-hours31 feathersPENDING
16:20FOUNTAIN 62.4L splash rights0HALTED
17:00LIBRARY CORNICE88 wing-minutes9 coosMATCHING

BOROUGH ROUTE LOAD

Route chart
CANAL ARC42% route load
Clocktower
CLOCK ROOST67% route load
Station pigeon
DEPOT WING81% route load
Fountain pigeons
FOUNTAIN 6Temporarily halted